Bug: Divine Light Gets Stuck in Place Upon Spawning with Prayer Bench Add-on
178 °C
Bug #7343

Divine Light Gets Stuck in Place Upon Spawning with Prayer Bench Add-on

Status: Open
Priority:
High
Added by: Anonymous on September 17, '26
Assigned to:
Unassigned
Due date:
Reported for:
Actual Result:
Not set
Expected Result:
Not set
Severity:
Not set
Reproducibility:
Not set
Platform:
Not set
Additional Notes & Comments:
Not set

Steps to Reproduce

No steps to reproduce

Explanation

Title: The Judgment — "Prayer Bench" add-on bug (Divine Light gets stuck in place upon spawning)

Description:
There is an issue with The Judgment's power add-on "Prayer Bench". According to the in-game description, the Divine Light is supposed to stop only upon colliding with an obstacle. However, with this add-on equipped, the light instantly gets stuck in place right upon spawning. It completely refuses to move forward, even if I am using the power in an empty field with absolutely no obstacles around.

Steps to Reproduce:

  1. Equip "Prayer Bench" add-on on The Judgment.
  2. Start a match on any map.
  3. Move to an open area (like an empty field).
  4. Use the Killer's power to spawn the Divine Light.
  5. Notice that the light immediately gets stuck in place and does not move forward at all.

Frequency: Constant (happens every time the power is used).

Watchers

Screenshots

None

Video Clips
Anonymous 4d 0
Log Files

None

No comments yet.
Loading comments...
Loading comments...
0 comments loaded

You need to join this project to comment on issues. Join Project