Bug: Pipeline connects to non-existent pumpjacks before they are called
124 °C
Bug #162
Pipeline connects to non-existent pumpjacks before they are called
| Status: | Open |
| Priority: |
Medium |
| Added by: |
|
| Assigned to: |
Unassigned
|
| Due date: | |
| Reported for: |
Steps to Reproduce
- Start an On-site Refining mission
- Find a Liquid Morkite well, DON'T call the pumpjack
- Build a pipeline to where that well is
- Try to connect the pipe to where the pumpjack would be
- AFTER the pipeline is connected, call the pumpjack
Explanation
You can connect pipelines to non-existent pumpjacks. If you try to connect a pipeline to where the pumpjack will be, before calling it, the pipeline will connect to nothing in midair, and once the pumpjack does arrive, it will already be connected.
Watchers
[ #1 ]
by
Loading comments...
Loading comments...
1 comment loaded
You don't have permission to comment on this issue.